If you are pouring the floor of your garage yourself, sooner or later the question comes up: how many centimetres? On forums you will find every figure between 10 and 25 cm, usually with no explanation. In this article we show you what thickness we recommend, what goes under the concrete, how to mix the concrete, and what the fibre costs for a single and a double garage.
In short: for a car on a well-compacted sub-base, we recommend a 10 cm concrete floor, and 15 cm for a larger car or a minibus. If a vehicle over 3.5 tonnes will stand in the garage, or you are setting up a workshop or want to install a vehicle lift, a structural engineer has to design the floor. And thickness alone is not enough: on soft, poorly compacted ground, even a 15 cm slab can sink.
What does the thickness depend on?
Three things:
- what will stand on the floor: a small car or a minibus, a heavy shelving unit, an axle stand or a vehicle lift;
- what is underneath: what the ground is like, and how thick and how firm the crushed stone layer is;
- how good the concrete is: how strong it is, and how well it copes with salt, water and frost.
We have not found a rule that sets the thickness of a garage floor for a private house in centimetres. The figures below are therefore our own recommendations, based on our own guides.
The driveway in front of the garage is a different job: there, the wheels roll outdoors, in rain and frost, and often on a slope. We have a separate guide for that: How to concrete a garage driveway, step by step.
How thick should a garage floor be?
Every row assumes a well-compacted sub-base.
| What will be in the garage? | Thickness | What to watch out for |
|---|---|---|
| Standard or small car | 10 cm | On a well-compacted sub-base, this is enough. If you also want to install a vehicle lift, the third row applies. |
| SUV, minibus, larger car | 15 cm | This row also applies if you will put the car on axle stands. Compact the sub-base with extra care here. |
| Vehicle over 3.5 tonnes, workshop, vehicle lift | over 15 cm, set by the structural engineer | In this case, an engineer has to calculate the slab. For a vehicle lift, the lift manufacturer’s foundation plan applies. |
Double garage: two cars do not need a thicker slab, as long as they are the same kind of car. The area is larger, though, so you need more joints (see below).
What goes under the concrete
This part is often left out of the debate about thickness, yet this is where the floor succeeds or fails.
Crushed stone bed. The concrete slab sits on compacted crushed stone. Compact the stone in several thinner layers, not in one thick layer. How thick it needs to be in total depends on the ground, the weather and the load.
Membrane. In a small garage with bays of about 3 × 3 m, you do not necessarily need one. On large areas where the joints are more than 8 metres apart, a slip layer goes under the concrete, usually made of two layers of plastic sheet. It reduces the friction under the concrete, so the slab is under less strain. In a garage, the local conditions decide.
Frost. The foundations of the garage walls must go down to frost-free depth, in line with local regulations. For a prefabricated garage, the manufacturer’s foundation plan applies.
Insulation. If you want to heat the garage, for example as a workshop, ask a specialist about insulating the floor before you pour. Afterwards, it can only be done on top of the floor.
Which concrete?
In winter, the car brings salty water into the garage. Salt and frost destroy weak concrete, so it does not pay to skimp on the concrete for a garage floor.
If you mix it yourself from ballast and cement
Most people mix the concrete for a garage floor at home, in a concrete mixer. Here is what to watch out for:
- Protect your skin and eyes. Wet cement and fresh concrete are strongly alkaline: they irritate the skin and can seriously damage the eyes. Wear gloves, long sleeves and safety glasses. If any gets in your eyes, rinse carefully with water for several minutes and see a doctor.
- Weigh, do not shovel. A shovel of ballast (the sand and gravel mix) is much heavier than a shovel of cement, so “three shovels of ballast, one shovel of cement” is not accurate. A bathroom scale is enough: weigh the empty bucket, and then you can weigh the cement, the ballast and the water too.
- Go easy on the water. More water makes the concrete easier to work, but weaker and shorter-lived. Without admixtures, add no more than 5 to 5.5 litres of water to 10 kg of cement. A garage floor gets salt on it, so here less water is better.
- Know your batch. Many people measure concrete by the wheelbarrow: a wheelbarrow is usually reckoned at about 60 litres, but there are 30-litre and 120-litre ones too. Measure how many litres of finished concrete one of your batches gives, because you also work out the fibre from that. If you have a 120-litre concrete mixer, one batch in it gives 60 litres of concrete.
- The mix. Put 20 kg of cement and 100 kg of ballast in one batch, with no more than 10 to 11 litres of water. If the ballast is damp, you need less water. Our tip: start with 8 to 9 litres and only add as much as you need to work the concrete, but never go over 10 to 11 litres. This makes about 60 litres of finished concrete. It is not possible to say exactly what strength home-mixed concrete reaches, so we do not give a strength class for it.
Mixing in the fibre. ArmoTec comes in 50 g discs in water-soluble film, so you put the discs into the mixer whole. For a 10 cm car garage floor you need 4 kg of fibre per cubic metre, which is 400 g per 100 litres of concrete, or 8 discs. At 15 cm it is 3.2 kg, which is 320 g per 100 litres. That is 6.4 discs, so round up to 7 discs. A 60-litre batch takes 5 discs at 10 cm and 4 discs at 15 cm. Do not throw the fibre in all at once as a lump; add it so that the mixer can spread it. Keep mixing until you can no longer see any lumps. In concrete that is too dry, the fibre spreads less easily. If so, mix for longer, and do not add more water than stated above. Always mix the fibre into the concrete, never sprinkle it onto the finished surface.
One of our customers in Hungary, Gyula Hives, described it like this (translated from Hungarian): “Using the macro fibre was very easy, I just sprinkled the stated amount into the concrete mixed in the concrete mixer, mixed it for about 2 more minutes, and then spread it.”
Do not let it dry out too fast. Freshly levelled concrete must not dry out too quickly, especially in warm and windy weather. After levelling, cover the concrete with plastic sheet, overlapping at the joins, with the edges weighed down with boards. Above 15 °C, leave it on for at least 4 days, between 10 and 15 °C for at least a week, and between 5 and 10 °C for at least 10 days. If you water it instead of covering it, keep it constantly damp, because alternating wetting and drying also causes cracks. Below 5 °C, it is better not to pour, or else protect the concrete from frost.
If you order ready-mix concrete from a plant
As a guide: for a garage floor, ask for concrete of at least strength class C30/37, because of the load and the strength requirement. Ask the plant about frost resistance; they will know what your floor needs.
If you want fibre mixed in, tell the plant before you order. If the plant is not adding the fibre itself, ask what that means for the paperwork of the delivered concrete.
Joints: where the floor is allowed to crack
Concrete shrinks as it dries. With a joint, you decide in advance where it should crack: there, it cracks in a straight line, not all over the place. So do not make large concrete areas without joints.
For smaller concrete areas around the house, the rule of thumb is a bay of about 3 × 3 m. Also leave a narrow joint along the walls, so that the slab does not press against the wall.
With the dimensions from the worked example, it looks like this:
- single garage, 6 × 3 m: one transverse joint in the middle, giving two bays of 3 × 3 m;
- double garage, 6 × 6 m: two joints, giving four bays of 3 × 3 m.
A fibre-reinforced floor needs joints too. You can read more in our guide to the carport slab.
Worked example: single and double garage
Two sizes, two thicknesses. Here is how to work it out:
Concrete (m³) = length (m) × width (m) × thickness (m)
ArmoTec (kg) = concrete (m³) × dosage (kg/m³), rounded up to a whole kilo at the end, because ArmoTec comes in 1 kg packs.
For a 10 cm car garage floor, our dosage guide gives 4 kg/m³; for 15 cm, our dosage table gives 3.2 kg/m³. A thicker slab needs less fibre per cubic metre but more per square metre: 0.40 kg at 10 cm, 0.48 kg at 15 cm. ArmoTec costs €9.99/kg incl. VAT. Shipping is €10, free from 12 kg.
| Garage | Thickness | Concrete | Dosage | ArmoTec | Material | Shipping | Total |
|---|---|---|---|---|---|---|---|
| Single, 6 × 3 m (18 m²) | 10 cm | 1.80 m³ | 4 kg/m³ | 8 kg | €79.92 | €10 | €89.92 |
| Single, 6 × 3 m (18 m²) | 15 cm | 2.70 m³ | 3.2 kg/m³ | 9 kg | €89.91 | €10 | €99.91 |
| Double, 6 × 6 m (36 m²) | 10 cm | 3.60 m³ | 4 kg/m³ | 15 kg | €149.85 | €0 | €149.85 |
| Double, 6 × 6 m (36 m²) | 15 cm | 5.40 m³ | 3.2 kg/m³ | 18 kg | €179.82 | €0 | €179.82 |
The price of the concrete is not in the table, because it is the same with mesh and with fibre. If you order or mix extra concrete to allow for waste, work out the fibre for the amount you actually mix.
And the mesh? For one layer of standard steel mesh (Q188A, 6.00 × 2.30 m sheet, 13.80 m²), we used the prices of a builders’ merchant in Bavaria: €66.74 per sheet and €90 for lorry delivery within 25 km, both incl. VAT. The mesh price is from 17 November 2026, the delivery charge from 12 November, and these are regional prices.
| Garage | Sheets | Mesh | With delivery | Collected yourself |
|---|---|---|---|---|
| Single, 18 m² | 2 sheets | €133.48 | €223.48 | €133.48 |
| Double, 36 m² | 3 sheets | €200.22 | €290.22 | €200.22 |
The mesh side does not include spacers, tie wire, cutting or the labour of placing it. Which mesh is equivalent in your floor is for the structural engineer to decide.
In this example, for the small garage, the lorry delivery (€90) is about 40% of the cost on the mesh side. If you collect the mesh yourself, the difference shrinks to a few tens of euros (you then have to arrange transport for the 6 m long sheets yourself). Which option works out cheaper for you depends on your own quotes. To use your own dimensions, try our calculator, and we have also described the dosage step by step. For a detailed cost comparison, see our article on the cost of macro fibre and steel mesh.
Macro fibre instead of mesh?
If the garage floor lies on the ground and does not carry any other part of the house, macro fibre can be an option instead of mesh, at the right dosage. The fibre is then spread through the concrete, over the full thickness. There is nothing to lift, tie or tread down during the pour.
ArmoTec is a 40 mm structural macro fibre made of polypropylene. It comes in 1 kg packs, as 50 g discs.
Do not cut back on the dosage. Our product page warns about this too: less fibre than recommended significantly reduces its effect, so be wary of recommendations of 1-2 kg/m³.
In these cases, it is not you who chooses between fibre and mesh; the structural engineer decides:
- if the floor is part of the structure of the house, or a slab with a structural design;
- if it will be the foundation for a vehicle lift;
- if it carries heavy vehicles or a workshop.
We have described when a concrete slab can be made without steel reinforcement in a separate article: Concrete slab without steel reinforcement: when is it possible?
Before you pour: five questions
Once you have answered these, the thickness is just one line on the shopping list:
- What will stand on the floor? A car, a larger car, a lift or a workshop. That gives you the thickness.
- What is the sub-base like? Who compacts the crushed stone, in how many layers, and what is underneath?
- Will you mix it yourself or order from a plant? If you mix it yourself, weigh the materials and do not add more water than needed. If you order, ask for at least C30/37, and tell the plant if you want fibre mixed in.
- Where will the joints go? Mark out the bays before you start pouring.
- Do you need a structural engineer? If the floor is part of the structure of the house, if a lift will go on it, if a heavy vehicle will stand on it or it will house a workshop: yes.
Frequently asked questions
How thick should a concrete garage floor be?
For a car on a well-compacted sub-base, 10 cm; for a larger car or a minibus, 15 cm. For a vehicle over 3.5 tonnes, a workshop or a vehicle lift, the structural engineer sets the thickness.
Which concrete is suitable for a garage floor?
If you mix it yourself: weigh the cement, the ballast and the water, and do not add more water than needed, because it makes the concrete weaker. If you order from a plant: as a guide, at least C30/37, and ask the plant about frost resistance.
Do you need a membrane under a garage floor?
In a small garage with bays of about 3 × 3 m, not necessarily. Large areas with widely spaced joints get a slip layer underneath. In a garage, the local conditions decide.
How much concrete do I need for a garage floor?
Length × width × thickness, in metres. A 6 × 3 m garage at 10 cm thick needs 6 × 3 × 0.10 = 1.80 m³ of concrete, without any extra for waste.
Can I pour a garage floor without mesh?
If the floor lies on the ground and is not part of the structure of the house, in many cases yes, with correctly dosed macro fibre. If a lift will go on it, a heavy vehicle will stand on it, it will house a workshop, or the floor is part of the structure, the structural engineer decides.